Reference: page 15-03; 5 hours
In this entry I finished deburring and fluting the main ribs for the RV-12 aircraft.
Step 1: Flute and straighten all of the W-1210 Main Rib flanges.
Step 2: Select six of the 13 W-1210-L Main Ribs and trim the fwd flange.
Step 3: Trim the forward flange of all 13 W_1210-R Main Ribs.
It's nice have this job behind me! The parts part were also etched, alodined and primed with zinc chromate.