Showing posts with label RV-12 page 32-07. Show all posts
Showing posts with label RV-12 page 32-07. Show all posts

Saturday, March 1, 2014

Vans Aircraft RV-12 Airplane Build, Section 32: Flight Controls (part 5)

Reference: pages 32-07, 32-08, 32-10; 2.0 hours

With the empennage installed on the RV-12 airplane kit, I decided to go back the the flight control section and get these finished up as well.

Reference: 32-07

Step 12: Press the Flap knob onto the Fork Assembly.



This completes page 32-07.

Reference: Page 32-08

Step 3: With the 0.025 spacers under the Dentent bracket and the Fork Assembly engaged in the lowest detent, The flap Knob should be flush with the Flap handle tube. I needed to trim some of the fork length to get a good fit.





Step 4: Removed and drilled a #30 rivet hole into the Knob and Fork Assembly per dimensions in RV-12 plans as directed by Van's Aircraft. Then installed a rivet.



Builder's Note: I also wanted a nice looking functional handle grip similar to the ones on the control sticks. Because of the diameter of the Flap handle a regualar bike grip wasn't going to work so I used a Regrip purchased through HomeDepot.









Even with carefully positioning it stretched a little during installation and needed trimming. This completed page 32-08.

Reference: Page 32-10

Step 10: Separate the rudder cable links.



This completes this entry for the RV-12 airplane and page 32-10.

Sunday, August 4, 2013

Vans Aircraft RV-12 Airplane Build, Section 32: Flight Controls (part 2)

Reference: pages 32-07, 32-08; 10.5 hours

Step 1: Separate the Flap Handle Fork and Flap Handle Spacer.



Step 2: Make the Fork Assembly using the Flap Handle Forks, Spacers and hardware called out on page 32-07 of the RV-12 aircraft planes.



Step 3: Cut the Flap Handle Tube to length.



Step 4: Carefully align the Fork Assembly with the Flap Handle Tube, clamp the parts together, then match-drill #30 the two holes in both side of the Fork Assembly into the flap handle tube.


Step 5: Attach the Fork Assembly to the Flap Handle Tube using the rivets called out.



Step 6: Separate the Flap Detent Bracket Angle and the Flap Dentent / Stop into individual parts.



Step 7: Attach the Flap Dentent Bracket Angles to the Flap Detent Bracket.



Step 8: Cleco the Flap Detent Angle that has the holes in its horizontal flange to the Flap Detent Bracket Plate.



Step 9: Match-drill #30 the holes of the Flap Detent Bracket Plate into the Flap Detent Angle that has no holes in its horizontal flange.



Step 10: Machine countersink the bottom of the Flap Detent Bracket Plate for the flush rivets.



Step 11: Attach the Flap Detent Bracket Angles to the Flap Detent Bracket to the Flap Detent Bracket Plate using the rivets called out.

Builder's Note: Before attaching the bracket I polished it with aluminum polish rather than painting it.





This completes most of page 32-07 and this entry on the RV-12 airplane. The only thing left is the final installation of the Flap Knob in the Flap Handle.

Reference page 32-08.

Step 1: Insert the Flap Detent Bracket through the slots in the Flap Handle and between the Flap Handle Forks.

Step 2: Make temporary 0.025 inch shims from scrap aluminum and place them between the Dent Bracket Assembly and the Seat Floors, then screw the Assembly to the seat floors.

Held off on step 3, 4 and 5 until the paint dries a little longer. As it is still soft.

Step 6: Cut the Spacer into four individual parts according to the dimension given on page 32-08 of the RV-12 plans.



Step 7: Position the Spacers in the Flaperon Torque Tubes, then match-drill #30 the holes of the flaperon torque tube into the spacers.



Step 8: Final drill #12 the two holes in each Spacer (the spacers only, not the flaperon torque tubes).



Step 9: Scuff the mating surface, then epoxy the Spacers to the Flaperon Torque tubes. Do not use too much epoxy, a 1/8 inch gap must be maintained between the spacers (use a scrap piece of 1/8 aluminum). Before the epoxy sets, install the rivets called out.

Builder's note: I cleaned to contact area on the torque tubes and spacers with MEK before gluing them with epoxy.



That completes this blog entry. Until next time.