Tuesday, February 21, 2012
Dynon Skyview Update
I now have more information on the conversion from the old Dynon 180 to the new Skyview EFIS in the RV-12 airplane by Van's Aircraft. There is an avionics conversion kit that contained all the needed parts. It is not something that is ordered separately but will come with the finishing kit. Or in my case as I have the old finishing kit with the Avionics Kit. So the Avionic kit has been ordered. I expect it will be some time before I see the kit as there is a health back-order log in front of me. When I do receive it I will post pictures of what is included and detail Until then enjoy!
Labels:
RV12,
RV12 Avionics
Wednesday, February 8, 2012
Update on Building the RV-12
It's been a while since I posted any building activity for the RV-12. I'm currently taking a break from building. Read, this term I'm taking Discrete math and learning a new computer language and it is killing me! Next term looks to be just as busy, but don't give up hope. This blog and the completion of the RV-12 is far from dead. So please hang in there it will get better. The siren call of the RV-12 is stronger than ever!
Van's Aircraft recently began shipping the new Avionic package featuring the Dynon Skyview. I talking with them and there are a few items that are changing in the airframe kits. For example the is now a AHARS mount in the tail cone above the static vent. I'm still unsure how they are handing these changes. As I get more information I will document these changes to the aircraft.
Van's Aircraft recently began shipping the new Avionic package featuring the Dynon Skyview. I talking with them and there are a few items that are changing in the airframe kits. For example the is now a AHARS mount in the tail cone above the static vent. I'm still unsure how they are handing these changes. As I get more information I will document these changes to the aircraft.
Labels:
RV12 News
Friday, January 6, 2012
Vans Aircraft RV-12 Build, Section 21: Mid Fuse Bibs & Bottom Skins (part 9)
Reference: page 21-15; 4.5 hours
The new of my demise has been greatly exaggerated! Work ofn the RV-12 has been spotty at best, however with summer just around the corner I will have more time to work on the airplane.I know the date on this post is January 6th (when this work was done), but it is May and I'm just getting around to posting this entry.
Step 1: Separate the F-1275A, B, C, D, E, and F fuselage Coner Skins along the center perforations. The notches in different tabs,shown in Figure 1 on page 21-15 of Van's Aircraft plans, can be used to differentiate the parts.


Step 2: Turn the fuselage upside-down on a pair of saw horses. As shown in the plans cleco F-1275F-R Fuselage Corner Skin to the Seat Floor Support, the Seat Rib and the Skin Attach Flange. Then, one after the other, cleco in place the F-1275E-R, D-R, C-R, B-R, & A-R Fuselage Corner Skins.

Step3: Using the rivets called out, rivet the Fuselage Corner to each other. Rivet the F-1275A-R to the Bulkhead Flange and rivet the F-1275F-R to the Skin Attach Flange (except for the four holes called out in the airplane plans). DO NOT rivet the fuselage corner skins to teh F-1253-R Seat Floor Support or the Seat Rib.


Step 4: Repeat Steps 2 and 3 for the left side of the fuselage.



Step 5: Cleco the Fuselage Corner Skin to the F-1202F Bulkhead, the F-1212-R Step Rib and the F-1275A-R Fuselage Corner Skin.

Step 6: Except for the two holes indicated in figure 3 of the RV-12 plans, rivet the F-1274-R Fuselage Corner Skin to the F-1275A-R Fuselage Corner Skin. DO NOTrivet to the F-1212-R Step Rib or to the F-1202F Bulkhead.

Step 7: Repeat Steps 5 and 6 for the left side of the fuselage.


Step 8: Seperate the F-1204Z Bottom Stiffenrs by removing the hatched areas as shown in the plans.

Step 9: Mark each part, then separate the F-1268A, B, C, D, & E Doublers.
That is it for this entry. Next we will get into attaching the fuselage bottom skin.
Step 1: Separate the F-1275A, B, C, D, E, and F fuselage Coner Skins along the center perforations. The notches in different tabs,shown in Figure 1 on page 21-15 of Van's Aircraft plans, can be used to differentiate the parts.
Step 2: Turn the fuselage upside-down on a pair of saw horses. As shown in the plans cleco F-1275F-R Fuselage Corner Skin to the Seat Floor Support, the Seat Rib and the Skin Attach Flange. Then, one after the other, cleco in place the F-1275E-R, D-R, C-R, B-R, & A-R Fuselage Corner Skins.
Step3: Using the rivets called out, rivet the Fuselage Corner to each other. Rivet the F-1275A-R to the Bulkhead Flange and rivet the F-1275F-R to the Skin Attach Flange (except for the four holes called out in the airplane plans). DO NOT rivet the fuselage corner skins to teh F-1253-R Seat Floor Support or the Seat Rib.
Step 4: Repeat Steps 2 and 3 for the left side of the fuselage.
Step 5: Cleco the Fuselage Corner Skin to the F-1202F Bulkhead, the F-1212-R Step Rib and the F-1275A-R Fuselage Corner Skin.
Step 6: Except for the two holes indicated in figure 3 of the RV-12 plans, rivet the F-1274-R Fuselage Corner Skin to the F-1275A-R Fuselage Corner Skin. DO NOTrivet to the F-1212-R Step Rib or to the F-1202F Bulkhead.
Step 7: Repeat Steps 5 and 6 for the left side of the fuselage.
Step 8: Seperate the F-1204Z Bottom Stiffenrs by removing the hatched areas as shown in the plans.
Step 9: Mark each part, then separate the F-1268A, B, C, D, & E Doublers.
That is it for this entry. Next we will get into attaching the fuselage bottom skin.
Labels:
RV-12 page 21-15,
RV12 aircraft,
RV12 Fuselage Kit
Wednesday, December 14, 2011
Vans Aircraft RV-12 Build, Section 21: Mid Fuse Bibs & Bottom Skins (part 8)
Reference: page 21-14; 1.5 hours
The sachets of parts for the RV-12 aircraft, stored in the garage, are getting smaller (and much easier to search through) while the fuselage is growing in size. Strange to think I picked up the tail kit from Van's Aircraft less than 10 months ago and in that time have built the tail, wings and am well into the fuselage.
Step 1: Secure the WD-1210 Control Column to the two Control Column Mount Assemblies using the hardware called out by Van's Aircraft in Figure 1 on page 21-14.Hardware call-outs are symmetrical about the fuselage center-line. Small tabs of tape can be used to hold the pairs of washers during instillation.
Builder's note: The key is to use the correct number and thickness of washers so the Control Column ears are parallel to the Column Mounts and not bowed in or out. Also, I forced Aeroshell #5 grease down into the bearing cage, as there will never be a better time to access this area. Below you can see a washer holder I made out of a tongue depressor.




Step 2: Dimple the holes in the top flange of both inboard F-120L& -R Step Ribs indicated in Figure 2 of the RV-12 plans on page 21-14.
Builder's note: I had a interesting time dimpling these two flanges, as the holes are very close to the rib web. A small sized #30 female die would have solved the problem. Not having one, I used a highly modified spare die to do the job. I have not experienced this kind of clearance issue on any of the previous rib parts to date on the RV-12.

Step 3: Dimple the sic sets of nutplate attach rivet holes in the top flange of the F-1202F Bulkhead.

Step 4: Rivet the F-1212-L & -R Step to the F-1203A Bulkhead using the rivets called out.


Step 5: As indicated by Van's Aircraft in Figure2, dimple the bottom hole in the forward flange of both outboard F-1212-L & -R Step Ribs and the two corresponding holes in the F-1202F Bulkhead.

Step 6: Cleco (DO NOT RIVET) the F-1202F Bulkhead to the F-1212 Step Ribs.

Step 7: Figure 3 on page 21-14 of the RV-12 plans, shows a bottom view of the fuselage. Install the snap bushings that are called out into the holes of the bulkheads as shown.
Builder's note: Not all of the snap bushings are pictured below . some are in places I couldn't get my camera into. Also in some of the pictures I am pointing at less obvious ones




This completes page 21-14 of the RV-12 plans.
Reference: page 21-14; 1.5 hours
The sachets of parts for the RV-12 aircraft, stored in the garage, are getting smaller (and much easier to search through) while the fuselage is growing in size. Strange to think I picked up the tail kit from Van's Aircraft less than 10 months ago and in that time have built the tail, wings and am well into the fuselage.
Step 1: Secure the WD-1210 Control Column to the two Control Column Mount Assemblies using the hardware called out by Van's Aircraft in Figure 1 on page 21-14.Hardware call-outs are symmetrical about the fuselage center-line. Small tabs of tape can be used to hold the pairs of washers during instillation.
Builder's note: The key is to use the correct number and thickness of washers so the Control Column ears are parallel to the Column Mounts and not bowed in or out. Also, I forced Aeroshell #5 grease down into the bearing cage, as there will never be a better time to access this area. Below you can see a washer holder I made out of a tongue depressor.
Step 2: Dimple the holes in the top flange of both inboard F-120L& -R Step Ribs indicated in Figure 2 of the RV-12 plans on page 21-14.
Builder's note: I had a interesting time dimpling these two flanges, as the holes are very close to the rib web. A small sized #30 female die would have solved the problem. Not having one, I used a highly modified spare die to do the job. I have not experienced this kind of clearance issue on any of the previous rib parts to date on the RV-12.
Step 3: Dimple the sic sets of nutplate attach rivet holes in the top flange of the F-1202F Bulkhead.
Step 4: Rivet the F-1212-L & -R Step to the F-1203A Bulkhead using the rivets called out.
Step 5: As indicated by Van's Aircraft in Figure2, dimple the bottom hole in the forward flange of both outboard F-1212-L & -R Step Ribs and the two corresponding holes in the F-1202F Bulkhead.
Step 6: Cleco (DO NOT RIVET) the F-1202F Bulkhead to the F-1212 Step Ribs.
Step 7: Figure 3 on page 21-14 of the RV-12 plans, shows a bottom view of the fuselage. Install the snap bushings that are called out into the holes of the bulkheads as shown.
Builder's note: Not all of the snap bushings are pictured below . some are in places I couldn't get my camera into. Also in some of the pictures I am pointing at less obvious ones
This completes page 21-14 of the RV-12 plans.
Labels:
RV-12 page 21-14,
RV12 aircraft,
RV12 Fuselage Kit
Tuesday, December 13, 2011
Vans Aircraft RV-12 Build, Section 21: Mid Fuse Bibs & Bottom Skins (part 7)
Reference: page 21-13; 4.5 hours
The RV-12 is coming along nicely. I am including a picture of the compressor I bought just in case someone was wanting to know the details. At this point in time I am very happy with it. I am also adding a possible builder Gotcha to the list from step 7 listed below. I didn't have a problem but it could easily catch someone.

Step 1: Cleco the F-1203A Bulkhead Assembly to the front flange of the Seat Ribs and to the front of the F-1253 -L & -R. Seat Floor Supports. In order to align the holes in the seat floor supports with their corresponding holes in the Bulkhead Assembly (the holes just below the F-1203D-L & -R Stub Supports), the seat floor supports need to be bent up slightly at the front of the seat floor.


Step 2: Rivet the F-1203A Bulkhead Assembly to the front flange of each F-1215-L & -R Seat Rib using the rivets called out in Figure 1 of the RV-12 plans. DO NOT rivet the F-1253-L &-R Seat Floor Supports at this time.



Step 3: Dimple the single pair of nutplate flange, and the four pair of nutplate attach holes along the inboard edge attach holes along the inboard edge of the F-1226-L & -R Seat Ramp Floors

Builder's note: I needed to flex the leading edge of the Seat Ramp Floor to get my dimpling set in place. Note use of tape to prevent scrapping of the floor panel.
Step 4: Dimple the single #30 hole on the forward flange, and the four #30 holes along the inboard edge of the Seat Ramp Floors that are called out for flush rivets.

Step 5: As indicated in Figure 2 by Van's Aircraft, final drill 1/2' the forward 3/8" hole in both the -R & -L Seat Ramp Floors.

Step 6: rivet in place the Seat Floors using the rivets called out in the plans on page 21-13.

Step 7: Reach through the lightening holes in one of the Seat Ribs and attach the nutplate to the back of the F-1203A Bulkhead. dimple then attach the four nutplates to the bottom of the Seat Rib flange, and the nutplate to the bottom of the F-1225-R Seat Floor using the rivets called out.


Builder's note: Here is the possible Gotcha. In the picture below there is a lip near the nutplate I am pointing at. If too short of a rivet set is use on the bottom, the lip will be crushed (not a good thing). Make sure the rivet yoke will clear this bottom lip by using a thick rivet set. That's all there is to it. Not much of a Gotcha.

Step 8: To remove the powder coating from the bolt holes in the WD-1210 Control Column, final-drill #12 all of the 3/16" holes and final-drill 1/4" all of the 1/4/" holes.
Builder's note: I used a angle drill to clear the side of the column tubing. I don't know how a regular drill could be used. Also I use a stepped bit for the 1/4" hole to ensure a tight fit with the bolt that will go through it.


Step 9: Insert the Control Column through the lightening holes of the Seat Ribs. If necessary, the F-1253 Seat Floor Support can be carefully bent down out of the way, while inserting the control column.

This completes page 21-13 and today's work session. I came to realize I have not posted any pictures of the RV-12's fuselage as a whole. So I will leave you with these pictures. Enjoy!



Reference: page 21-13; 4.5 hours
The RV-12 is coming along nicely. I am including a picture of the compressor I bought just in case someone was wanting to know the details. At this point in time I am very happy with it. I am also adding a possible builder Gotcha to the list from step 7 listed below. I didn't have a problem but it could easily catch someone.
Step 1: Cleco the F-1203A Bulkhead Assembly to the front flange of the Seat Ribs and to the front of the F-1253 -L & -R. Seat Floor Supports. In order to align the holes in the seat floor supports with their corresponding holes in the Bulkhead Assembly (the holes just below the F-1203D-L & -R Stub Supports), the seat floor supports need to be bent up slightly at the front of the seat floor.
Step 2: Rivet the F-1203A Bulkhead Assembly to the front flange of each F-1215-L & -R Seat Rib using the rivets called out in Figure 1 of the RV-12 plans. DO NOT rivet the F-1253-L &-R Seat Floor Supports at this time.
Step 3: Dimple the single pair of nutplate flange, and the four pair of nutplate attach holes along the inboard edge attach holes along the inboard edge of the F-1226-L & -R Seat Ramp Floors
Builder's note: I needed to flex the leading edge of the Seat Ramp Floor to get my dimpling set in place. Note use of tape to prevent scrapping of the floor panel.
Step 4: Dimple the single #30 hole on the forward flange, and the four #30 holes along the inboard edge of the Seat Ramp Floors that are called out for flush rivets.
Step 5: As indicated in Figure 2 by Van's Aircraft, final drill 1/2' the forward 3/8" hole in both the -R & -L Seat Ramp Floors.
Step 6: rivet in place the Seat Floors using the rivets called out in the plans on page 21-13.
Step 7: Reach through the lightening holes in one of the Seat Ribs and attach the nutplate to the back of the F-1203A Bulkhead. dimple then attach the four nutplates to the bottom of the Seat Rib flange, and the nutplate to the bottom of the F-1225-R Seat Floor using the rivets called out.
Builder's note: Here is the possible Gotcha. In the picture below there is a lip near the nutplate I am pointing at. If too short of a rivet set is use on the bottom, the lip will be crushed (not a good thing). Make sure the rivet yoke will clear this bottom lip by using a thick rivet set. That's all there is to it. Not much of a Gotcha.
Step 8: To remove the powder coating from the bolt holes in the WD-1210 Control Column, final-drill #12 all of the 3/16" holes and final-drill 1/4" all of the 1/4/" holes.
Builder's note: I used a angle drill to clear the side of the column tubing. I don't know how a regular drill could be used. Also I use a stepped bit for the 1/4" hole to ensure a tight fit with the bolt that will go through it.
Step 9: Insert the Control Column through the lightening holes of the Seat Ribs. If necessary, the F-1253 Seat Floor Support can be carefully bent down out of the way, while inserting the control column.
This completes page 21-13 and today's work session. I came to realize I have not posted any pictures of the RV-12's fuselage as a whole. So I will leave you with these pictures. Enjoy!
Sunday, December 11, 2011
Vans Aircraft RV-12 Build, Section 21: Mid Fuse Bibs & Bottom Skins (part 6)
Reference: page 21-11, 21-12; 4.5 hours
Welcome! This blog details the construction of my RV-12 (and other projects) E-LSA aircraft kitted by Van's Aircraft. This entry is the 6th part of building the fuselage kit. I have to apologize for some of the blurry pictures. I was attempting not to use the camera flash as much.
Step 1 Separate the two sets of F-1230E Bulkhead Doublers by removing the hatched areas shown in Figure 1 of the RV-12 plans on page 21-11.
Where possible, install rivets in the F-1203A Bulkhead with the manufactured heads on the forward side.
Step 2: Rivet the F-1203E-L &-R Bulkhead Doublers to both ends of the F-1203A Bulkhead, to the F-1203C Sub Spar Receptacles, and Sub Spar Receptacle Supports using the rivets called out in Figure 2 on page 21-11 of the RV-12 plans. As indicated in the figure, do not install rivets in the four holes in both sets of bulkhead doublers, or the eight holes in the spar receptacles support outbd of the doublers.


Step 3: Rivet the flange of the F-1203E-L & -R Bulkhead Doublers to each other using the rivets called out in Figure 2.
Step 4: Rivet the Control Column Mount Assemblies (and their associated one-leg nutplates) to the Bulkhead using the rivets called out. No not rivet the two bottom holes in both assemblies

Step 5: Rivet the four nutplates t the sloped flanges of both Control Column Mount Assemblies using the rivets called out.

This completes page 21-11.
Reference page 21-12;
Step 1: Separate the F-1203J Bulkhead Doubler by removing the hatched areas.

Step 2: Rivet the 17 nutplates shown in Figure 2 on page 21-12 of the RV-12 plans, to the Bulkhead using the rivets called out. DO NOT install a nutplate at either end of the top row of nutplates I'm pointing to one of these in the picture below.

Step 3: Rivet the F-1203J Bulkhead Doublers to the Bulkhead using the rivets called out in Figure 2.

This completes page 21-12 of the RV-12. Thanks for looking.
Reference: page 21-11, 21-12; 4.5 hours
Welcome! This blog details the construction of my RV-12 (and other projects) E-LSA aircraft kitted by Van's Aircraft. This entry is the 6th part of building the fuselage kit. I have to apologize for some of the blurry pictures. I was attempting not to use the camera flash as much.
Step 1 Separate the two sets of F-1230E Bulkhead Doublers by removing the hatched areas shown in Figure 1 of the RV-12 plans on page 21-11.
Where possible, install rivets in the F-1203A Bulkhead with the manufactured heads on the forward side.
Step 2: Rivet the F-1203E-L &-R Bulkhead Doublers to both ends of the F-1203A Bulkhead, to the F-1203C Sub Spar Receptacles, and Sub Spar Receptacle Supports using the rivets called out in Figure 2 on page 21-11 of the RV-12 plans. As indicated in the figure, do not install rivets in the four holes in both sets of bulkhead doublers, or the eight holes in the spar receptacles support outbd of the doublers.
Step 3: Rivet the flange of the F-1203E-L & -R Bulkhead Doublers to each other using the rivets called out in Figure 2.
Step 4: Rivet the Control Column Mount Assemblies (and their associated one-leg nutplates) to the Bulkhead using the rivets called out. No not rivet the two bottom holes in both assemblies
Step 5: Rivet the four nutplates t the sloped flanges of both Control Column Mount Assemblies using the rivets called out.
This completes page 21-11.
Reference page 21-12;
Step 1: Separate the F-1203J Bulkhead Doubler by removing the hatched areas.
Step 2: Rivet the 17 nutplates shown in Figure 2 on page 21-12 of the RV-12 plans, to the Bulkhead using the rivets called out. DO NOT install a nutplate at either end of the top row of nutplates I'm pointing to one of these in the picture below.
Step 3: Rivet the F-1203J Bulkhead Doublers to the Bulkhead using the rivets called out in Figure 2.
This completes page 21-12 of the RV-12. Thanks for looking.